Question
Which of the following statements about the Chenab Rail Bridge is correct?
1) It is a Cable-stayed bridge.
2) The Chenab Rail Bridge is taller than the Eiffel Tower.
3) It is a part of the Golden Quadrilateral Railway Project.
4) It is the world’s highest Railway arch bridge.
Select the correct answer from the codes given below
Tap an option to check your answer.
Show answer & explanation
Answer & Explanation
Correct answer: (D) 2 and 4
| Statement | Correctness | Explanation |
|---|---|---|
| Statement 1 | INCORRECT | The Chenab Bridge is an arch bridge, not a cable-stayed bridge. It features a steel arch design. |
| Statement 2 | CORRECT | The bridge stands at 359 meters above the river bed, making it taller than the Eiffel Tower (324 meters). |
| Statement 3 | INCORRECT | It is part of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project, not the Golden Quadrilateral Railway Project. |
| Statement 4 | CORRECT | It is the world’s highest railway arch bridge, standing 359 meters above the Chenab River. |
Key Facts about Chenab Rail Bridge
| Feature | Details |
|---|---|
| Type | Steel arch bridge |
| Height | 359 meters above river bed |
| Location | Between Bakkal and Kauri in Jammu & Kashmir |
| Project | Part of USBRL (Udhampur-Srinagar-Baramulla Rail Link) |
| Record | World’s highest railway arch bridge |
| Comparison | 35 meters taller than Eiffel Tower |